Q4 2024

Final Commissioning & Storage Hub Grand Opening Preparation

(Oct–Dec 2024)

Production Hub (Plot 1)

  • Final structural closure continues.
  • MEP installations advanced across all blocks.
  • Internal works (blockwork, plastering, utilities) progressed.

Storage Hub (Plot 2)

  • Overhead cranes installed & calibrated.
  • Fire systems tested and certified.
  • Yard traffic systems deployed.
  • Access controls, CCTV, and monitoring fully integrated.
  • Operational procedures, SOPs and logistics flow developed.
  • Final snagging works closed.

Overall: Storage Hub entered full pre-operations mode.