(Oct–Dec 2024)
Production Hub (Plot 1)
- Final structural closure continues.
- MEP installations advanced across all blocks.
- Internal works (blockwork, plastering, utilities) progressed.
Storage Hub (Plot 2)
- Overhead cranes installed & calibrated.
- Fire systems tested and certified.
- Yard traffic systems deployed.
- Access controls, CCTV, and monitoring fully integrated.
- Operational procedures, SOPs and logistics flow developed.
- Final snagging works closed.
Overall: Storage Hub entered full pre-operations mode.