Q3 2024

STORAGE HUB CONSTRUCTION COMPLETED

(Jul–Sep 2024)
MAJOR MILESTONE: Storage Hub fully constructed – September 2024

Production Hub (Plot 1)

  • Roof installation and steel frames completed across blocks.
  • MEP systems advanced into mid-stage installation.
  • External road and corridor networks shaped.

Storage Hub (Plot 2) – CONSTRUCTION COMPLETE

  • All structures, roofing, cladding and steel frames completed.
  • 96 covered bins + 16 open units + oversized bays completed.
  • Weighbridges installed (18m & 30m, 150MT).
  • Fire systems, lighting, and CCTV installed.
  • External yards paved and marked.


Although structurally complete in September 2024, the following still needed time:

  • Overhead crane installation
  • Testing & commissioning
  • Operational setup
  • Safety sign-offs
  • Final authority approvals
  • Tenant coordination
  • Internal system integration